Worldwide wastewater treatment observatory · France

Aguas SB Observatory · public data to understand water

WWTP CHAUMONT-SUR-THARONNE CENTERPARCS

France · official identifier FR0441046S0003

4,500h-e design capacity (2022) · 2429th of 4,051 (tied with 82 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR0441046S0003 · reported size 4,500 h-e design capacity · received load 4,360 h-e · reported treatment: PS · data year 2022. 2429th of 4,051 records with reported size in the inventory of France (tied with 82 others); < 0.01 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.1 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

4,500h-e design capacity
4,360h-e received load (2022)
97 %reported load/capacity ratio (not hydraulic utilisation)
2429th of 4,051by reported size among the 4,051 records with a size in the inventory (tied with 82 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates47.6212, 1.9038 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: France

Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

195,485reference kWh per year for this load
44.8kWh per h-e (average load) per year
29,323€ per year at 0.15 €/kWh
75 %share of energy used for aeration

what this estimate is · Inputs: 4,360 p.e. of reported load; equivalent average load 4,361 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (632 m³/day of reference), not measured or available for reclamation.

LOCATION

France: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Lamotte Beuvron9.1 km9,0007,116primary, secondary and tertiary
Nouan Le Fuzelier 'Le Petit Burtin'10.6 km3,1502,041primary, secondary and tertiary
Laferte-Saint-Aubin11.7 km9,0008,218primary, secondary and tertiary
La Ferte Saint Cyr18.3 km2,400860primary, secondary and tertiary
Lailly-en-Val23.3 km4,0007,428primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP CHAUMONT-SUR-THARONNE CENTERPARCS report?

Reported size: 4,500 h-e design capacity. Received load: 4,360 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of CHAUMONT-SUR-THARONNE CENTERPARCS?

Aguas SB simulator reference scenario for 4,360 p.e. of reported load: 195,485 kWh per year (44.8 kWh per p.e. of average load), with aeration as 75 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.