Worldwide wastewater treatment observatory · France
Aguas SB Observatory · public data to understand water
WWTP CONDE-SUR-VIRE URBAINE
France · official identifier FR035054602000
3,200h-e design capacity (2022) · 3065th of 4,051 (tied with 28 others)
Facility inactive according to reported data. Historical profile: excluded from current aggregates.
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR035054602000 · reported size 3,200 h-e design capacity · reported treatment: PS · data year 2022. 3065th of 4,051 records with reported size in the inventory of France (tied with 28 others); < 0.01 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.4 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | inactive according to reported data |
| Reported coordinates | 49.0503, -1.0512 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: France
Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Conde Sur Vire Industrielle | 0.4 km | 40,000 | 2,285 | primary, secondary and tertiary |
| Torigni | 4.8 km | 9,900 | 6,586 | primary, secondary and tertiary |
| Saint Lo | 9.2 km | 40,000 | 30,167 | primary, secondary and tertiary |
| Pont-Hebert 2 | 14.3 km | 4,200 | 1,916 | primary, secondary and tertiary |
| Marigny Nouvelle | 15.5 km | 2,700 | 2,541 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP CONDE-SUR-VIRE URBAINE report?
Reported size: 3,200 h-e design capacity. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.