Worldwide wastewater treatment observatory · France

Aguas SB Observatory · public data to understand water

WWTP CUISE-LA-MOTTE (NOUVELLE)

France · official identifier FR036018802000

7,550h-e design capacity (2022) · 1676th of 4,051 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR036018802000 · reported size 7,550 h-e design capacity · received load 4,769 h-e · reported treatment: PST · data year 2022. 1676th of 4,051 records with reported size in the inventory of France (tied with 1 others); < 0.01 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.1 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

7,550h-e design capacity
4,769h-e received load (2022)
63 %reported load/capacity ratio (not hydraulic utilisation)
1676th of 4,051by reported size among the 4,051 records with a size in the inventory (tied with 1 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates49.4056, 3.0027 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: France

Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

213,093reference kWh per year for this load
44.6kWh per h-e (average load) per year
31,964€ per year at 0.15 €/kWh
75 %share of energy used for aeration

what this estimate is · Inputs: 4,769 p.e. of reported load; equivalent average load 4,775 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.3estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (692 m³/day of reference), not measured or available for reclamation.

LOCATION

France: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Attichy3.0 km4,0002,231primary, secondary and tertiary
Pierrefonds_25.8 km3,0002,250primary, secondary and tertiary
Tracy Le Mont Nouvelle8.8 km3,5002,820primary, secondary and tertiary
Choisy-Au-Bac (Nouvelle)10.2 km6,4003,608primary, secondary and tertiary
Clairoix11.3 km4,0002,703primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP CUISE-LA-MOTTE (NOUVELLE) report?

Reported size: 7,550 h-e design capacity. Received load: 4,769 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of CUISE-LA-MOTTE (NOUVELLE)?

Aguas SB simulator reference scenario for 4,769 p.e. of reported load: 213,093 kWh per year (44.6 kWh per p.e. of average load), with aeration as 75 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.