Worldwide wastewater treatment observatory · France

Aguas SB Observatory · public data to understand water

WWTP EVRY-COURCOURONNES

France · official identifier FR039122801000

250,000h-e design capacity (2022) · 51st of 4,051 (tied with 3 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR039122801000 · reported size 250,000 h-e design capacity · received load 205,325 h-e · reported treatment: PST · data year 2022. 51st of 4,051 records with reported size in the inventory of France (tied with 3 others); 0.26 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.2 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

250,000h-e design capacity
205,325h-e received load (2022)
82 %reported load/capacity ratio (not hydraulic utilisation)
51st of 4,051by reported size among the 4,051 records with a size in the inventory (tied with 3 others) · 0.26 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates48.6265, 2.4650 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: France

Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

5,808,247reference kWh per year for this load
28.3kWh per h-e (average load) per year
871,237€ per year at 0.15 €/kWh
64 %share of energy used for aeration

what this estimate is · Inputs: 205,325 p.e. of reported load; equivalent average load 205,427 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

10.9estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (29,772 m³/day of reference), not measured or available for reclamation.

LOCATION

France: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Corbeil-Essonnes0.2 km96,000124,421primary, secondary and tertiary
Le Coudray Montceaux7.3 km6,0005,827primary, secondary and tertiary
Vert-Le-Grand 29.8 km3,9702,134primary, secondary and tertiary
Saint Fargeau Ponthierry11.9 km24,00019,230primary, secondary and tertiary
Evry-Gregy-Sur-Yerre12.5 km3,0003,639primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP EVRY-COURCOURONNES report?

Reported size: 250,000 h-e design capacity. Received load: 205,325 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of EVRY-COURCOURONNES?

Aguas SB simulator reference scenario for 205,325 p.e. of reported load: 5,808,247 kWh per year (28.3 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.