Worldwide wastewater treatment observatory · France
Aguas SB Observatory · public data to understand water
WWTP FITOU
France · official identifier FR060911144002
3,000h-e design capacity (2022) · 3127th of 4,051 (tied with 181 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR060911144002 · reported size 3,000 h-e design capacity · received load 1,195 h-e · reported treatment: PST · data year 2022. 3127th of 4,051 records with reported size in the inventory of France (tied with 181 others); < 0.01 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.8 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 42.8867, 2.9954 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: France
Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,195 p.e. of reported load; equivalent average load 1,194 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (173 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Port-Leucate Nouvelle | 3.8 km | 43,666 | 16,639 | primary, secondary and tertiary |
| Leucate Village | 3.9 km | 7,767 | 5,541 | primary, secondary and tertiary |
| Leucate la Franqui Nouvelle | 5.3 km | 7,500 | 2,804 | primary and secondary |
| Salses | 8.0 km | 5,000 | 3,712 | primary, secondary and tertiary |
| Lapalme | 9.7 km | 2,000 | 4,018 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP FITOU report?
Reported size: 3,000 h-e design capacity. Received load: 1,195 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of FITOU?
Aguas SB simulator reference scenario for 1,195 p.e. of reported load: 57,972 kWh per year (48.6 kWh per p.e. of average load), with aeration as 69 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.