166,750h-e design capacity (2022) · 78th of 4,051

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR032729902000 · reported size 166,750 h-e design capacity · received load 98,364 h-e · reported treatment: PST · data year 2022. 78th of 4,051 records with reported size in the inventory of France; 0.17 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 11.9 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

166,750h-e design capacity
98,364h-e received load (2022)
59 %reported load/capacity ratio (not hydraulic utilisation)
78th of 4,051by reported size among the 4,051 records with a size in the inventory · 0.17 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates49.0550, 1.1747 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: France

Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,098,784reference kWh per year for this load
31.5kWh per h-e (average load) per year
464,818€ per year at 0.15 €/kWh
60 %share of energy used for aeration

what this estimate is · Inputs: 98,364 p.e. of reported load; equivalent average load 98,415 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

5.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (14,263 m³/day of reference), not measured or available for reclamation.

LOCATION

France: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
La Bonneville-Sur-Iton11.9 km3,9503,179primary, secondary and tertiary
Pacy-Sur-Eure14.7 km12,0005,495primary, secondary and tertiary
Heudebouville Ecoparc214.9 km14,8009,312primary, secondary and tertiary
Aubevoye18.4 km34,50033,523primary, secondary and tertiary
Saint-Andre-de-L'Eure18.7 km8,5002,484primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP GRAVIGNY-CTEU report?

Reported size: 166,750 h-e design capacity. Received load: 98,364 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of GRAVIGNY-CTEU?

Aguas SB simulator reference scenario for 98,364 p.e. of reported load: 3,098,784 kWh per year (31.5 kWh per p.e. of average load), with aeration as 60 % of consumption. Estimate with the country reference profile; not a measurement of the plant.