Worldwide wastewater treatment observatory · France
Aguas SB Observatory · public data to understand water
WWTP MEAUX
France · official identifier FR037751301000
115,833h-e design capacity (2022) · 129th of 4,051
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR037751301000 · reported size 115,833 h-e design capacity · received load 173,394 h-e · reported treatment: PST · data year 2022. 129th of 4,051 records with reported size in the inventory of France; 0.12 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.5 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 48.9487, 2.8742 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 1998 · The national register dates the commissioning of this facility to 1998. French Ministry responsible for the ecological transition
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L07; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: France
Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 173,394 p.e. of reported load; equivalent average load 173,480 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (25,142 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Chauconin-Neufmontiers Nouv | 2.5 km | 2,600 | 2,722 | primary, secondary and tertiary |
| Mareuil les Meaux | 4.6 km | 9,900 | 8,154 | primary, secondary and tertiary |
| Esbly | 6.3 km | 5,233 | 6,487 | primary, secondary and tertiary |
| Monthyon | 6.5 km | 3,000 | 1,058 | primary, secondary and tertiary |
| Varreddes | 6.6 km | 5,000 | 2,780 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP MEAUX report?
Reported size: 115,833 h-e design capacity. Received load: 173,394 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of MEAUX?
Aguas SB simulator reference scenario for 173,394 p.e. of reported load: 4,959,646 kWh per year (28.6 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.