Worldwide wastewater treatment observatory · France

Aguas SB Observatory · public data to understand water

WWTP NOGARO

France · official identifier FR0532296V001

2,800h-e design capacity (2022) · 3342nd of 4,051 (tied with 24 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR0532296V001 · reported size 2,800 h-e design capacity · received load 2,397 h-e · reported treatment: PS · data year 2022. 3342nd of 4,051 records with reported size in the inventory of France (tied with 24 others); < 0.01 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 12.6 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

2,800h-e design capacity
2,397h-e received load (2022)
86 %reported load/capacity ratio (not hydraulic utilisation)
3342nd of 4,051by reported size among the 4,051 records with a size in the inventory (tied with 24 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates43.7654, -0.0293 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: France

Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

111,278reference kWh per year for this load
46.3kWh per h-e (average load) per year
16,692€ per year at 0.15 €/kWh
72 %share of energy used for aeration

what this estimate is · Inputs: 2,397 p.e. of reported load; equivalent average load 2,401 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.1estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (348 m³/day of reference), not measured or available for reclamation.

LOCATION

France: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Riscle12.6 km2,5002,185primary, secondary and tertiary
Eauze16.2 km5,0002,256primary, secondary and tertiary
Cazaubon19.7 km7,0001,263primary, secondary and tertiary
Aire Sur L Adour20.5 km12,0005,873primary and secondary
Villeneuve de Marsan26.6 km2,5001,837primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP NOGARO report?

Reported size: 2,800 h-e design capacity. Received load: 2,397 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of NOGARO?

Aguas SB simulator reference scenario for 2,397 p.e. of reported load: 111,278 kWh per year (46.3 kWh per p.e. of average load), with aeration as 72 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.