Worldwide wastewater treatment observatory · France

Aguas SB Observatory · public data to understand water

WWTP RIVIERE SALEE BOURG GRD CASE

France · official identifier FR080000197221

7,000h-e design capacity (2022) · 1756th of 4,051 (tied with 69 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR080000197221 · reported size 7,000 h-e design capacity · received load 14,124 h-e · reported treatment: PS · data year 2022. 1756th of 4,051 records with reported size in the inventory of France (tied with 69 others); < 0.01 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.9 km · 12 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

7,000h-e design capacity
14,124h-e received load (2022)
202 %reported load/capacity ratio (not hydraulic utilisation)
1756th of 4,051by reported size among the 4,051 records with a size in the inventory (tied with 69 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates14.5427, -60.9772 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: France

Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

561,555reference kWh per year for this load
39.7kWh per h-e (average load) per year
84,233€ per year at 0.15 €/kWh
54 %share of energy used for aeration

what this estimate is · Inputs: 14,124 p.e. of reported load; equivalent average load 14,131 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.7estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (2,048 m³/day of reference), not measured or available for reclamation.

LOCATION

France: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Ducos-Canal Cocote2.9 km300567primary and secondary
Saint-Esprit-Petit Fond4.0 km1,2501,755primary and secondary
Ducos-Pays Noye4.4 km11,00018,367primary and secondary
Saint-Esprit-Zac Avenir4.5 km1,8001,800primary and secondary
Lamentin Gaigneron7.5 km35,00030,333primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP RIVIERE SALEE BOURG GRD CASE report?

Reported size: 7,000 h-e design capacity. Received load: 14,124 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of RIVIERE SALEE BOURG GRD CASE?

Aguas SB simulator reference scenario for 14,124 p.e. of reported load: 561,555 kWh per year (39.7 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.