Worldwide wastewater treatment observatory · France

Aguas SB Observatory · public data to understand water

WWTP SAINT-GINGOLPH (SUISSE)

France · official identifier FRCH0000174237

3,227h-e design capacity (2022) · 3061st of 4,051

Facility inactive according to reported data. Historical profile: excluded from current aggregates.

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FRCH0000174237 · reported size 3,227 h-e design capacity · received load 900 h-e · reported treatment: PS · data year 2022. 3061st of 4,051 records with reported size in the inventory of France; < 0.01 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 11.7 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

3,227h-e design capacity
900h-e received load (2022)
28 %reported load/capacity ratio (not hydraulic utilisation)
3061st of 4,051by reported size among the 4,051 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusinactive according to reported data
Reported coordinates46.3896, 6.8157 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: France

Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

45,263reference kWh per year for this load
50.1kWh per h-e (average load) per year
6,789€ per year at 0.15 €/kWh
67 %share of energy used for aeration

what this estimate is · Inputs: 900 p.e. of reported load; equivalent average load 904 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (131 m³/day of reference), not measured or available for reclamation.

LOCATION

France: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Bernex 211.7 km5,2502,398primary, secondary and tertiary
Abondance14.8 km26,30024,535primary, secondary and tertiary
Le Biot-Couvaloup20.2 km3,9001,741primary, secondary and tertiary
Saint-Jean-D'Aulps21.0 km8,5002,613primary, secondary and tertiary
Feternes-Cornales21.4 km5,20010,709primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP SAINT-GINGOLPH (SUISSE) report?

Reported size: 3,227 h-e design capacity. Received load: 900 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of SAINT-GINGOLPH (SUISSE)?

Aguas SB simulator reference scenario for 900 p.e. of reported load: 45,263 kWh per year (50.1 kWh per p.e. of average load), with aeration as 67 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.