Worldwide wastewater treatment observatory · France

Aguas SB Observatory · public data to understand water

WWTP SAINT-VICTOR-DE-MORESTEL / VILLAGE

France · official identifier FR060938465001

450p.e. design capacity (2022) · 4004th of 4,051 (tied with 2 others) with a size · 4,061 records in the country

Facility inactive according to reported data. Historical profile: excluded from current aggregates.

European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · official identifier FR060938465001 · reported size 450 p.e. design capacity · reported treatment: primary + secondary (as reported to the EEA: PS) · data year 2022. 4004th of 4,051 records with reported size in the inventory of France (tied with 2 others); < 0.01 % of the sum of those 4,051 records in p.e. (sum of records, not national capacity); nearest inventoried plant at 1.9 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

450p.e. design capacity
4004th of 4,051by reported size among the 4,051 records with a size in the inventory (tied with 2 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusinactive according to reported data
Reported coordinates45.6898, 5.5057 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · dataset record

PUBLIC SOURCES

What public sources report

Documented milestones

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L116; it does not change the official data.

REGULATORY REFERENCES

Regulatory reference: France

Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

France: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (p.e.)Load 2022Treatment
Morestel1.9 km4,5004,056primary and secondary
Vezeronce-Curtin / Le Cholard4.2 km5,0303,055primary, secondary and tertiary
Les Avenieres les Nappes6.9 km39,00017,731primary, secondary and tertiary
Saint-Genix-les-Villages13.2 km3,8003,394primary and secondary
Montalieu-Vercieu-215.6 km8,1005,612primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP SAINT-VICTOR-DE-MORESTEL / VILLAGE report?

Reported size: 450 p.e. design capacity. Units are retained without conversion.

What treatment is reported?

Treatment primary + secondary (as reported to the EEA: PS). Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.