Worldwide wastewater treatment observatory · France
Aguas SB Observatory · public data to understand water
WWTP SAINTE-FOY-TARENTAISE VICLAIRE
France · official identifier FR060973232001
300p.e. design capacity (2022) · 4020th of 4,051 (tied with 9 others) with a size · 4,061 records in the country
Facility inactive according to reported data. Historical profile: excluded from current aggregates.
European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · official identifier FR060973232001 · reported size 300 p.e. design capacity · reported treatment: primary + secondary (as reported to the EEA: PS) · data year 2022. 4020th of 4,051 records with reported size in the inventory of France (tied with 9 others); < 0.01 % of the sum of those 4,051 records in p.e. (sum of records, not national capacity); nearest inventoried plant at 8.1 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | inactive according to reported data |
| Reported coordinates | 45.6026, 6.8602 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · dataset record |
PUBLIC SOURCES
What public sources report
Documented milestones
- 1983 · Sandre’s historical inventory dates the commissioning of this wastewater treatment plant to 1983. French National Water Data and Reference Service (Sandre)
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L116; it does not change the official data.
REGULATORY REFERENCES
Regulatory reference: France
Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (p.e.) | Load 2022 | Treatment |
|---|---|---|---|---|
| Bourg Saint Maurice | 8.1 km | 61,950 | 91,093 | primary, secondary and tertiary |
| Tignes les Brevieres | 10.5 km | 50,000 | 5,533 | primary, secondary and tertiary |
| Bellentre-2 | 11.8 km | 27,617 | 13,434 | primary and secondary |
| Val D'Isère | 17.4 km | 32,000 | 23,090 | primary, secondary and tertiary |
| Aime la Plagne | 19.0 km | 59,500 | 31,753 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SAINTE-FOY-TARENTAISE VICLAIRE report?
Reported size: 300 p.e. design capacity. Units are retained without conversion.
What treatment is reported?
Treatment primary + secondary (as reported to the EEA: PS). Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.