WWTP SCHARRACHBERGHEIM
France · official identifier FR026752500844
17,000h-e design capacity (2022) · 900th of 4,051 (tied with 14 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR026752500844 · reported size 17,000 h-e design capacity · received load 21,615 h-e · reported treatment: PST · data year 2022. 900th of 4,051 records with reported size in the inventory of France (tied with 14 others); 0.02 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.7 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 48.5814, 7.4832 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: France
Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 21,615 p.e. of reported load; equivalent average load 21,625 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (3,134 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Molsheim | 3.7 km | 32,000 | 26,033 | primary, secondary and tertiary |
| Wasselonne | 6.0 km | 9,833 | 9,546 | primary, secondary and tertiary |
| Ernolsheim Sur Bruche | 7.6 km | 18,000 | 17,643 | primary, secondary and tertiary |
| Rosheim | 9.2 km | 14,800 | 14,973 | primary, secondary and tertiary |
| Mollkirch | 10.0 km | 2,730 | 2,453 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SCHARRACHBERGHEIM report?
Reported size: 17,000 h-e design capacity. Received load: 21,615 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of SCHARRACHBERGHEIM?
Aguas SB simulator reference scenario for 21,615 p.e. of reported load: 865,939 kWh per year (40.0 kWh per p.e. of average load), with aeration as 59 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.