Worldwide wastewater treatment observatory · France

Aguas SB Observatory · public data to understand water

WWTP TIGNES LE LAC

France · official identifier FR060973296001

27,000h-e design capacity (2022) · 604th of 4,051 (tied with 11 others)

Facility inactive according to reported data. Historical profile: excluded from current aggregates.

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR060973296001 · reported size 27,000 h-e design capacity · reported treatment: PS · data year 2022. 604th of 4,051 records with reported size in the inventory of France (tied with 11 others); 0.03 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.1 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

27,000h-e design capacity
604th of 4,051by reported size among the 4,051 records with a size in the inventory (tied with 11 others) · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusinactive according to reported data
Reported coordinates45.4738, 6.9120 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: France

Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

France: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Val D'Isère4.1 km32,00023,090primary, secondary and tertiary
Tignes les Brevieres4.7 km50,0005,533primary, secondary and tertiary
Bessans18.3 km5,5002,794primary and secondary
Bellentre-218.4 km27,61713,434primary and secondary
Bourg Saint Maurice18.5 km61,95091,093primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP TIGNES LE LAC report?

Reported size: 27,000 h-e design capacity. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.