Worldwide wastewater treatment observatory · France
Aguas SB Observatory · public data to understand water
WWTP VIODOS-ABENSE-DE-BAS
France · official identifier FR0564559V004
not reportedh-e design capacity (2022)
Facility inactive according to reported data. Historical profile: excluded from current aggregates.
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR0564559V004 · reported size not reported h-e design capacity · reported treatment: PS · data year 2022. nearest inventoried plant at 0.1 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | inactive according to reported data |
| Reported coordinates | 43.2464, -0.8769 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: France
Regulatory framework of France. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Viodos Abense de Bas (Intercommunale) | 0.1 km | 10,000 | 9,359 | primary, secondary and tertiary |
| Castetnau Camblong (Intercommunale) | 12.7 km | 4,000 | 2,633 | primary, secondary and tertiary |
| St Palais 2 | 15.6 km | 9,000 | 5,273 | primary, secondary and tertiary |
| Sauveterre de Bearn | 17.5 km | 10,000 | 4,783 | primary, secondary and tertiary |
| Ledeuix | 20.8 km | 3,800 | 2,473 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP VIODOS-ABENSE-DE-BAS report?
Reported size: not reported h-e design capacity. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.