Worldwide wastewater treatment observatory · Germany
Aguas SB Observatory · public data to understand water
WWTP 1030002015 KA Wolfsburg
Germany · official identifier DETP_NI103000201
170,000h-e design capacity (2022) · 137th of 3,798 (tied with 4 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_NI103000201 · reported size 170,000 h-e design capacity · received load 145,554 h-e · reported treatment: PST · data year 2022. 137th of 3,798 records with reported size in the inventory of Germany (tied with 4 others); 0.12 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.7 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 52.4701, 10.8015 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2026-04-20 · The thermal treatment contract for sludge from the Wolfsburg-Stahlberg wastewater treatment plant was signed. German Public Procurement Portal
Other published data
| Mean annual volume treated reported in the 2022 cycle | 8,257,743 m³/year (2022) · source |
|---|
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Germany
Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 145,554 p.e. of reported load; equivalent average load 145,672 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (31,440 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| 1544042042 Ka Danndorf | 9.7 km | 5,500 | 4,193 | primary, secondary and tertiary |
| Oebisfelde | 12.8 km | 9,200 | 7,533 | primary, secondary and tertiary |
| 1030002006 Ka Hattorf | 13.5 km | 9,900 | 8,082 | primary, secondary and tertiary |
| 1510252073 Ka Sassenburg | 13.7 km | 15,000 | 9,093 | primary, secondary and tertiary |
| 1544042061 Ka Bahrdorf | 16.6 km | 7,500 | 8,603 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP 1030002015 KA Wolfsburg report?
Reported size: 170,000 h-e design capacity. Received load: 145,554 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of 1030002015 KA Wolfsburg?
Aguas SB simulator reference scenario for 145,554 p.e. of reported load: 4,610,236 kWh per year (31.6 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.