Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP 3560022001 KA Grasberg

Germany · official identifier DETP_NI356002201

7,200h-e design capacity (2022) · 2630th of 3,798 (tied with 6 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_NI356002201 · reported size 7,200 h-e design capacity · received load 7,021 h-e · reported treatment: PST · data year 2022. 2630th of 3,798 records with reported size in the inventory of Germany (tied with 6 others); < 0.01 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.3 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

7,200h-e design capacity
7,021h-e received load (2022)
98 %reported load/capacity ratio (not hydraulic utilisation)
2630th of 3,798by reported size among the 3,798 records with a size in the inventory (tied with 6 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates53.1722, 8.9723 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

320,344reference kWh per year for this load
45.6kWh per h-e (average load) per year
48,052€ per year at 0.15 €/kWh
46 %share of energy used for aeration

what this estimate is · Inputs: 7,021 p.e. of reported load; equivalent average load 7,029 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.6estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,517 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
3574072051 Ka Tarmstedt7.3 km11,00012,267primary, secondary and tertiary
3560112001 Ka Worpswede7.5 km13,5009,413primary, secondary and tertiary
3610092001 Ka Oyten/Ottersberg10.8 km75,00076,878primary, secondary and tertiary
3560072008 Ka Osterholz-Scharmbeck13.0 km64,00030,715primary, secondary and tertiary
3564012009 Ka Hambergen15.1 km13,30012,748primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP 3560022001 KA Grasberg report?

Reported size: 7,200 h-e design capacity. Received load: 7,021 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of 3560022001 KA Grasberg?

Aguas SB simulator reference scenario for 7,021 p.e. of reported load: 320,344 kWh per year (45.6 kWh per p.e. of average load), with aeration as 46 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.