Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP 3580192013 KA Schneverdingen

Germany · official identifier DETP_NI358019201

35,000h-e design capacity (2022) · 841st of 3,798 (tied with 37 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_NI358019201 · reported size 35,000 h-e design capacity · received load 35,000 h-e · reported treatment: PST · data year 2022. 841st of 3,798 records with reported size in the inventory of Germany (tied with 37 others); 0.02 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 10.1 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

35,000h-e design capacity
35,000h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
841st of 3,798by reported size among the 3,798 records with a size in the inventory (tied with 37 others) · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates53.1089, 9.7785 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,478,168reference kWh per year for this load
42.2kWh per h-e (average load) per year
221,725€ per year at 0.15 €/kWh
54 %share of energy used for aeration

what this estimate is · Inputs: 35,000 p.e. of reported load; equivalent average load 35,028 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

2.8estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (7,560 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
3580172018 Ka Neuenkirchen10.1 km9,5005,889primary, secondary and tertiary
3580212005 Ka Soltau16.9 km47,50029,959primary, secondary and tertiary
3574012063 Ka Bothel18.7 km10,0008,805primary, secondary and tertiary
3570512069 Ka Visselhövede18.9 km14,90016,379primary, secondary and tertiary
3574022064 Ka Lauenbrück19.1 km15,00012,400primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP 3580192013 KA Schneverdingen report?

Reported size: 35,000 h-e design capacity. Received load: 35,000 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of 3580192013 KA Schneverdingen?

Aguas SB simulator reference scenario for 35,000 p.e. of reported load: 1,478,168 kWh per year (42.2 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.