Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP Bergheim Kenten

Germany · official identifier DETP_NW1817

120,000h-e design capacity (2022) · 206th of 3,798 (tied with 11 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_NW1817 · reported size 120,000 h-e design capacity · received load 107,395 h-e · reported treatment: PST · data year 2022. 206th of 3,798 records with reported size in the inventory of Germany (tied with 11 others); 0.08 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.1 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

120,000h-e design capacity
107,395h-e received load (2022)
89 %reported load/capacity ratio (not hydraulic utilisation)
206th of 3,798by reported size among the 3,798 records with a size in the inventory (tied with 11 others) · 0.08 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates50.9398, 6.6544 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Population of the served area (Bergheim Kenten): 100,234 inhabitants (2025, North Rhine-Westphalia environmental authority).

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L07; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,620,353reference kWh per year for this load
33.7kWh per h-e (average load) per year
543,053€ per year at 0.15 €/kWh
54 %share of energy used for aeration

what this estimate is · Inputs: 107,395 p.e. of reported load; equivalent average load 107,479 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

8.5estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (23,197 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Elsdorf5.1 km20,40016,662primary, secondary and tertiary
Bergheim Auenheim6.7 km23,00018,243primary, secondary and tertiary
Bergheim Glessen8.3 km9,0007,757primary, secondary and tertiary
Bedburg Kaster9.4 km66,00054,668primary, secondary and tertiary
Köln Weiden11.0 km80,00064,048primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Bergheim Kenten report?

Reported size: 120,000 h-e design capacity. Received load: 107,395 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Bergheim Kenten?

Aguas SB simulator reference scenario for 107,395 p.e. of reported load: 3,620,353 kWh per year (33.7 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.