Worldwide wastewater treatment observatory · Germany
Aguas SB Observatory · public data to understand water
WWTP Bönen
Germany · official identifier DETP_NW2540
71,000h-e design capacity (2022) · 411th of 3,798
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_NW2540 · reported size 71,000 h-e design capacity · received load 62,112 h-e · reported treatment: PST · data year 2022. 411th of 3,798 records with reported size in the inventory of Germany; 0.05 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.4 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 51.5885, 7.7393 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Germany
Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 62,112 p.e. of reported load; equivalent average load 62,161 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (13,416 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Unna-Hemmerde | 5.4 km | 8,000 | 6,685 | primary, secondary and tertiary |
| Kamen-Körnebach | 6.8 km | 160,000 | 139,365 | primary, secondary and tertiary |
| Fröndenberg-Frömern | 8.7 km | 2,000 | 2,214 | primary, secondary and tertiary |
| Hamm-West | 9.6 km | 252,000 | 246,604 | primary, secondary and tertiary |
| Werne | 10.3 km | 54,000 | 47,596 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Bönen report?
Reported size: 71,000 h-e design capacity. Received load: 62,112 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Bönen?
Aguas SB simulator reference scenario for 62,112 p.e. of reported load: 2,339,333 kWh per year (37.6 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.