Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP Bottrop

Germany · official identifier DETP_NW1502

1,340,000h-e design capacity (2022) · 8th of 3,798

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_NW1502 · reported size 1,340,000 h-e design capacity · received load 1,482,779 h-e · reported treatment: PST · data year 2022. 8th of 3,798 records with reported size in the inventory of Germany; 0.91 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 11.4 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

1,340,000h-e design capacity
1,482,779h-e received load (2022)
111 %reported load/capacity ratio (not hydraulic utilisation)
8th of 3,798by reported size among the 3,798 records with a size in the inventory · 0.91 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates51.5109, 6.9809 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Population of the served area (Bottrop): 745,337 inhabitants (2025, North Rhine-Westphalia environmental authority).

Documented milestones

  • 1997 · In 1997 the former Bernemündung treatment plant closed after the Welheimer Mark plant entered service. City of Bottrop

Other published data

Mean annual volume treated reported in the 2022 cycle96,939,683 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

41,344,027reference kWh per year for this load
27.9kWh per h-e (average load) per year
6,201,604€ per year at 0.15 €/kWh
64 %share of energy used for aeration

what this estimate is · Inputs: 1,482,779 p.e. of reported load; equivalent average load 1,483,964 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

116.9estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (320,280 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Gelsenkirchen-Picksmühlenbach11.4 km57,00050,895primary, secondary and tertiary
Herten-Westerholt13.3 km36,00029,214primary, secondary and tertiary
Essen-Süd13.7 km135,000120,768primary, secondary and tertiary
Klärwerk Emschermündung14.4 km1,386,6001,249,976primary, secondary and tertiary
Essen-Kupferdreh14.5 km96,00079,547primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Bottrop report?

Reported size: 1,340,000 h-e design capacity. Received load: 1,482,779 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Bottrop?

Aguas SB simulator reference scenario for 1,482,779 p.e. of reported load: 41,344,027 kWh per year (27.9 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.