Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP Büchenbach

Germany · official identifier DETP_BYN-K0106

5,000p.e. design capacity (2022) · 2997th of 3,798 (tied with 52 others)

Facility inactive according to reported data. Historical profile: excluded from current aggregates.

European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · official identifier DETP_BYN-K0106 · reported size 5,000 p.e. design capacity · received load 3,050 p.e. · reported treatment: primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · data year 2022. 2997th of 3,798 records with reported size in the inventory of Germany (tied with 52 others); < 0.01 % of the sum of those 3,798 records in p.e. (sum of records, not national capacity); nearest inventoried plant at 1.8 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

5,000p.e. design capacity
3,050p.e. received load (2022)
61 %reported load/capacity ratio (not hydraulic utilisation)
2997th of 3,798by reported size among the 3,798 records with a size in the inventory (tied with 52 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusinactive according to reported data
Reported coordinates49.2699, 11.0766 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · dataset record

PUBLIC SOURCES

What public sources report

Documented milestones

  • 1986 · The Bavarian inventory records 1986 as the construction or refurbishment year of the Büchenbach wastewater treatment plant (N-K0106). Bavarian State Parliament

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L77; it does not change the official data.

REGULATORY REFERENCES

Regulatory reference: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

144,087reference kWh per year for this load
47.2kWh per p.e. (average load) per year
21,613€ per year at 0.15 €/kWh
70 %share of energy used for aeration

what this estimate is · Inputs: 3,050 p.e. of reported load; equivalent average load 3,053 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (659 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (p.e.)Load 2022Treatment
Roth Stadt1.8 km65,00036,250primary, secondary and tertiary
Rednitzhembach4.1 km9,0006,061primary, secondary and tertiary
Abenberg7.9 km8,0003,477primary, secondary and tertiary
Zv Unteres Schwarzachtal S.Wendelstein7.9 km40,00035,050primary, secondary and tertiary
Schwabach8.0 km95,00043,050primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Büchenbach report?

Reported size: 5,000 p.e. design capacity. Received load: 3,050 p.e.. Units are retained without conversion.

What treatment is reported?

Treatment primary + secondary + tertiary (more stringent) (as reported to the EEA: PST). Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Büchenbach?

Aguas SB simulator reference scenario for 3,050 p.e. of reported load: 144,087 kWh per year (47.2 kWh per p.e. of average load), with aeration as 70 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.