Worldwide wastewater treatment observatory · Germany
Aguas SB Observatory · public data to understand water
WWTP Dörentrup
Germany · official identifier DETP_NW2743
15,000h-e design capacity (2022) · 1719th of 3,798 (tied with 96 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_NW2743 · reported size 15,000 h-e design capacity · received load 7,879 h-e · reported treatment: PST · data year 2022. 1719th of 3,798 records with reported size in the inventory of Germany (tied with 96 others); 0.01 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.2 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 52.0274, 8.9806 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Germany
Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 7,879 p.e. of reported load; equivalent average load 7,886 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,702 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Barntrup | 7.2 km | 12,400 | 8,472 | primary, secondary and tertiary |
| Lemgo-Grevenmarsch | 8.3 km | 77,000 | 72,000 | primary, secondary and tertiary |
| Blomberg, Istrup | 11.2 km | 4,000 | 3,073 | primary, secondary and tertiary |
| Detmold-Zentral | 12.2 km | 135,000 | 95,705 | primary, secondary and tertiary |
| Extertal-Almena | 12.2 km | 18,000 | 12,947 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Dörentrup report?
Reported size: 15,000 h-e design capacity. Received load: 7,879 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Dörentrup?
Aguas SB simulator reference scenario for 7,879 p.e. of reported load: 357,055 kWh per year (45.3 kWh per p.e. of average load), with aeration as 46 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.