Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP Helgoland

Germany · official identifier DETP_SH56025

6,150p.e. design capacity (2022) · 2810th of 3,798

European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · official identifier DETP_SH56025 · reported size 6,150 p.e. design capacity · received load 2,750 p.e. · reported treatment: primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · data year 2022. 2810th of 3,798 records with reported size in the inventory of Germany; < 0.01 % of the sum of those 3,798 records in p.e. (sum of records, not national capacity); nearest inventoried plant at 43.7 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

6,150p.e. design capacity
2,750p.e. received load (2022)
45 %reported load/capacity ratio (not hydraulic utilisation)
2810th of 3,798by reported size among the 3,798 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates54.1746, 7.8908 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · dataset record

PUBLIC SOURCES

What public sources report

Documented milestones

  • 2022 · In 2022, the German Environment Agency recorded an annual effluent load of 5,947.53 kg of nitrogen and 1,319.81 kg of phosphorus for this wastewater treatment plant. German Environment Agency

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L69; it does not change the official data.

REGULATORY REFERENCES

Regulatory reference: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

130,880reference kWh per year for this load
47.6kWh per p.e. (average load) per year
19,632€ per year at 0.15 €/kWh
69 %share of energy used for aeration

what this estimate is · Inputs: 2,750 p.e. of reported load; equivalent average load 2,752 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (594 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (p.e.)Load 2022Treatment
4550212005 Ka Wangerooge43.7 km18,0003,774primary, secondary and tertiary
4620142018 Ka Spiekeroog47.2 km8,0002,706primary, secondary and tertiary
St. Peter-Ording50.7 km33,00010,255primary, secondary and tertiary
4620192002 Ka Harlesiel52.6 km10,0004,241primary, secondary and tertiary
4550202010 Ka Schillig53.8 km11,0002,608primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Helgoland report?

Reported size: 6,150 p.e. design capacity. Received load: 2,750 p.e.. Units are retained without conversion.

What treatment is reported?

Treatment primary + secondary + tertiary (more stringent) (as reported to the EEA: PST). Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Helgoland?

Aguas SB simulator reference scenario for 2,750 p.e. of reported load: 130,880 kWh per year (47.6 kWh per p.e. of average load), with aeration as 69 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.