Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP Neumünster

Germany · official identifier DETP_SH58044

380,000h-e design capacity (2022) · 49th of 3,798 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_SH58044 · reported size 380,000 h-e design capacity · received load 152,241 h-e · reported treatment: PST · data year 2022. 49th of 3,798 records with reported size in the inventory of Germany (tied with 1 others); 0.26 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.5 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

380,000h-e design capacity
152,241h-e received load (2022)
40 %reported load/capacity ratio (not hydraulic utilisation)
49th of 3,798by reported size among the 3,798 records with a size in the inventory (tied with 1 others) · 0.26 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates54.0620, 9.9318 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2025 · Neumünster invited tenders for electrical equipment to expand sludge digestion at its wastewater treatment plant. City of Neumünster

Other published data

Mean annual volume treated reported in the 2022 cycle9,318,388 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

4,777,325reference kWh per year for this load
31.4kWh per h-e (average load) per year
716,599€ per year at 0.15 €/kWh
57 %share of energy used for aeration

what this estimate is · Inputs: 152,241 p.e. of reported load; equivalent average load 152,363 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

12estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (32,884 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Boostedt7.5 km7,0006,988primary, secondary and tertiary
Aukrug-Bünzen9.0 km7,0003,603primary, secondary and tertiary
Großenaspe9.6 km4,0002,573primary and secondary
Brokstedt10.9 km4,0003,400primary, secondary and tertiary
Nortorf13.8 km21,50022,258primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Neumünster report?

Reported size: 380,000 h-e design capacity. Received load: 152,241 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Neumünster?

Aguas SB simulator reference scenario for 152,241 p.e. of reported load: 4,777,325 kWh per year (31.4 kWh per p.e. of average load), with aeration as 57 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.