Worldwide wastewater treatment observatory · Germany
Aguas SB Observatory · public data to understand water
WWTP Ochtrup
Germany · official identifier DETP_NW3058
58,350h-e design capacity (2022) · 496th of 3,798
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_NW3058 · reported size 58,350 h-e design capacity · received load 33,800 h-e · reported treatment: PST · data year 2022. 496th of 3,798 records with reported size in the inventory of Germany; 0.04 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.9 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 52.1975, 7.2015 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Germany
Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 33,800 p.e. of reported load; equivalent average load 33,828 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (7,301 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Metelen | 4.9 km | 17,500 | 12,630 | primary, secondary and tertiary |
| 4560012022 Ka Bentheim | 9.3 km | 18,000 | 11,107 | primary, secondary and tertiary |
| Steinfurt-Burgsteinfurt | 9.9 km | 46,800 | 30,811 | primary, secondary and tertiary |
| Neuenkirchen/Wettringen | 10.0 km | 49,700 | 62,656 | primary, secondary and tertiary |
| Heek | 10.2 km | 12,000 | 10,019 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Ochtrup report?
Reported size: 58,350 h-e design capacity. Received load: 33,800 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Ochtrup?
Aguas SB simulator reference scenario for 33,800 p.e. of reported load: 1,437,496 kWh per year (42.5 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.