Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP Rodgau / Weiskirchen

Germany · official identifier DETP_HE064380110501

85,000h-e design capacity (2022) · 326th of 3,798 (tied with 8 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_HE064380110501 · reported size 85,000 h-e design capacity · received load 76,188 h-e · reported treatment: PST · data year 2022. 326th of 3,798 records with reported size in the inventory of Germany (tied with 8 others); 0.06 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.8 km · 11 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

85,000h-e design capacity
76,188h-e received load (2022)
90 %reported load/capacity ratio (not hydraulic utilisation)
326th of 3,798by reported size among the 3,798 records with a size in the inventory (tied with 8 others) · 0.06 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates50.0630, 8.8847 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

2,753,548reference kWh per year for this load
36.1kWh per h-e (average load) per year
413,032€ per year at 0.15 €/kWh
54 %share of energy used for aeration

what this estimate is · Inputs: 76,188 p.e. of reported load; equivalent average load 76,251 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

6estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (16,457 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Hainburg / Hainstadt4.8 km10,00010,000primary, secondary and tertiary
Hainburg / Klein-Krotzenburg5.4 km8,0007,028primary, secondary and tertiary
Großkrotzenburg5.7 km11,00011,000primary, secondary and tertiary
Heusenstamm5.7 km40,00028,867primary, secondary and tertiary
Seligenstadt5.9 km35,00022,000primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Rodgau / Weiskirchen report?

Reported size: 85,000 h-e design capacity. Received load: 76,188 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Rodgau / Weiskirchen?

Aguas SB simulator reference scenario for 76,188 p.e. of reported load: 2,753,548 kWh per year (36.1 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.