WWTP Schieder-Schwalenberg
Germany · official identifier DETP_NW2773
9,300h-e design capacity (2022) · 2327th of 3,798 (tied with 3 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_NW2773 · reported size 9,300 h-e design capacity · received load 8,724 h-e · reported treatment: PST · data year 2022. 2327th of 3,798 records with reported size in the inventory of Germany (tied with 3 others); < 0.01 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.4 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 51.9344, 9.1973 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Germany
Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 8,724 p.e. of reported load; equivalent average load 8,729 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,884 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Lügde,Elbrinxen | 4.4 km | 3,200 | 2,222 | primary, secondary and tertiary |
| Blomberg Zentralkläranlage | 6.8 km | 20,000 | 12,845 | primary, secondary and tertiary |
| Lügde,Rischenau | 7.7 km | 3,200 | 2,137 | primary, secondary and tertiary |
| 2520032012 Ka Bad Pyrmont | 7.9 km | 65,000 | 51,133 | primary, secondary and tertiary |
| Blomberg, Istrup | 9.0 km | 4,000 | 3,073 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Schieder-Schwalenberg report?
Reported size: 9,300 h-e design capacity. Received load: 8,724 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Schieder-Schwalenberg?
Aguas SB simulator reference scenario for 8,724 p.e. of reported load: 392,947 kWh per year (45.0 kWh per p.e. of average load), with aeration as 47 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.