Worldwide wastewater treatment observatory · Germany
Aguas SB Observatory · public data to understand water
WWTP SKA DITZINGEN - DITZINGEN
Germany · official identifier DETP_BW1185100000007
120,000h-e design capacity (2022) · 206th of 3,798 (tied with 11 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_BW1185100000007 · reported size 120,000 h-e design capacity · received load 74,250 h-e · reported treatment: PST · data year 2022. 206th of 3,798 records with reported size in the inventory of Germany (tied with 11 others); 0.08 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.1 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 48.8406, 9.0564 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Germany
Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 74,250 p.e. of reported load; equivalent average load 74,309 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (16,038 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Leonberg - Mittleres Glemstal | 3.1 km | 90,000 | 57,950 | primary, secondary and tertiary |
| Weissach | 8.2 km | 11,500 | 10,650 | primary, secondary and tertiary |
| Ska Leudelsbach - Markgröningen | 8.4 km | 35,000 | 27,750 | primary, secondary and tertiary |
| Ska Talhausen - Markgröningen | 8.7 km | 75,000 | 32,850 | primary, secondary and tertiary |
| Rutesheim | 9.2 km | 11,700 | 9,200 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SKA DITZINGEN - DITZINGEN report?
Reported size: 120,000 h-e design capacity. Received load: 74,250 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of SKA DITZINGEN - DITZINGEN?
Aguas SB simulator reference scenario for 74,250 p.e. of reported load: 2,697,507 kWh per year (36.3 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.