Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP SKA WEIDACH - KIRCHHEIM A.N.

Germany · official identifier DETP_BW1185100000038

6,500h-e design capacity (2022) · 2737th of 3,798 (tied with 42 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_BW1185100000038 · reported size 6,500 h-e design capacity · received load 7,950 h-e · reported treatment: PST · data year 2022. 2737th of 3,798 records with reported size in the inventory of Germany (tied with 42 others); < 0.01 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.3 km · 14 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

6,500h-e design capacity
7,950h-e received load (2022)
122 %reported load/capacity ratio (not hydraulic utilisation)
2737th of 3,798by reported size among the 3,798 records with a size in the inventory (tied with 42 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates49.0471, 9.1494 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

360,021reference kWh per year for this load
45.3kWh per h-e (average load) per year
54,003€ per year at 0.15 €/kWh
46 %share of energy used for aeration

what this estimate is · Inputs: 7,950 p.e. of reported load; equivalent average load 7,955 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.6estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,717 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Ska Gemmrigheim - Gemmrigheim1.3 km5,5006,800primary, secondary and tertiary
Ska Zv Kw Neckarwestheim2.0 km12,5006,650primary, secondary and tertiary
Ska Bönnigheim - Bönnigheim3.2 km22,00012,900primary, secondary and tertiary
Ska Lauffen Am Neckar3.8 km41,00022,750primary, secondary and tertiary
Ska Walheim - Walheim4.0 km4,8007,150primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP SKA WEIDACH - KIRCHHEIM A.N. report?

Reported size: 6,500 h-e design capacity. Received load: 7,950 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of SKA WEIDACH - KIRCHHEIM A.N.?

Aguas SB simulator reference scenario for 7,950 p.e. of reported load: 360,021 kWh per year (45.3 kWh per p.e. of average load), with aeration as 46 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.