Worldwide wastewater treatment observatory · Germany
Aguas SB Observatory · public data to understand water
WWTP SKA Wolterdingen
Germany · official identifier DETP_BW3265100000005
4,600p.e. design capacity (2022) · 3160th of 3,798 (tied with 15 others)
Facility inactive according to reported data. Historical profile: excluded from current aggregates.
European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · official identifier DETP_BW3265100000005 · reported size 4,600 p.e. design capacity · received load 4,650 p.e. · reported treatment: primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · data year 2022. 3160th of 3,798 records with reported size in the inventory of Germany (tied with 15 others); < 0.01 % of the sum of those 3,798 records in p.e. (sum of records, not national capacity); nearest inventoried plant at 6.9 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | inactive according to reported data |
| Reported coordinates | 47.9660, 8.4332 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · dataset record |
PUBLIC SOURCES
What public sources report
Documented milestones
- 2020 · In 2020, the German Environment Agency recorded an annual effluent load of 8,647 kg of nitrogen and 245 kg of phosphorus for this wastewater treatment plant. German Environment Agency
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L81; it does not change the official data.
REGULATORY REFERENCES
Regulatory reference: Germany
Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 4,650 p.e. of reported load; equivalent average load 4,652 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,004 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (p.e.) | Load 2022 | Treatment |
|---|---|---|---|---|
| Ska Donaueschingen | 6.9 km | 120,000 | 98,950 | primary, secondary and tertiary |
| Ska Hammereisenbach | 7.2 km | 7,000 | 6,250 | primary, secondary and tertiary |
| Ska Villingen | 8.8 km | 70,500 | 56,850 | primary, secondary and tertiary |
| Ka Löffingen-Seppenhofen | 12.2 km | 9,360 | 6,950 | primary, secondary and tertiary |
| Ska Unterkirnach | 13.0 km | 4,400 | 2,250 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SKA Wolterdingen report?
Reported size: 4,600 p.e. design capacity. Received load: 4,650 p.e.. Units are retained without conversion.
What treatment is reported?
Treatment primary + secondary + tertiary (more stringent) (as reported to the EEA: PST). Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of SKA Wolterdingen?
Aguas SB simulator reference scenario for 4,650 p.e. of reported load: 214,286 kWh per year (46.1 kWh per p.e. of average load), with aeration as 71 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (final public version) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.