Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP Werder OT Kemnitz

Germany · official identifier DETP_BB126

38,000h-e design capacity (2022) · 796th of 3,798 (tied with 8 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_BB126 · reported size 38,000 h-e design capacity · received load 28,336 h-e · reported treatment: PST · data year 2022. 796th of 3,798 records with reported size in the inventory of Germany (tied with 8 others); 0.03 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.9 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

38,000h-e design capacity
28,336h-e received load (2022)
75 %reported load/capacity ratio (not hydraulic utilisation)
796th of 3,798by reported size among the 3,798 records with a size in the inventory (tied with 8 others) · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates52.4150, 12.9031 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,236,496reference kWh per year for this load
43.6kWh per h-e (average load) per year
185,474€ per year at 0.15 €/kWh
53 %share of energy used for aeration

what this estimate is · Inputs: 28,336 p.e. of reported load; equivalent average load 28,361 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

2.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (6,121 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Satzkorn7.9 km10,0008,576primary, secondary and tertiary
Potsdam-Nord8.7 km140,000182,129primary, secondary and tertiary
Roskow12.8 km49,00034,580primary, secondary and tertiary
Jeserig15.6 km16,00011,954primary, secondary and tertiary
Lehnin16.0 km30,0004,702primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Werder OT Kemnitz report?

Reported size: 38,000 h-e design capacity. Received load: 28,336 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Werder OT Kemnitz?

Aguas SB simulator reference scenario for 28,336 p.e. of reported load: 1,236,496 kWh per year (43.6 kWh per p.e. of average load), with aeration as 53 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.