Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP Zab Amberg-Kümmersbruck, Sitz Amberg

Germany · official identifier DETP_BYWEN-K0159

170,000h-e design capacity (2022) · 137th of 3,798 (tied with 4 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_BYWEN-K0159 · reported size 170,000 h-e design capacity · received load 157,078 h-e · reported treatment: PST · data year 2022. 137th of 3,798 records with reported size in the inventory of Germany (tied with 4 others); 0.12 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.0 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

170,000h-e design capacity
157,078h-e received load (2022)
92 %reported load/capacity ratio (not hydraulic utilisation)
137th of 3,798by reported size among the 3,798 records with a size in the inventory (tied with 4 others) · 0.12 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates49.3776, 11.9143 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 1990 · The Bavarian inventory records 1990 as the construction or refurbishment year of the Kümmersbruck wastewater treatment plant (WEN-K0159). Bavarian State Parliament

Other published data

Mean annual volume treated reported in the 2022 cycle7,414,819 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

4,897,290reference kWh per year for this load
31.2kWh per h-e (average load) per year
734,594€ per year at 0.15 €/kWh
57 %share of energy used for aeration

what this estimate is · Inputs: 157,078 p.e. of reported load; equivalent average load 157,204 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

12.4estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (33,929 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Ebermannsdorf2.0 km4,0002,002primary, secondary and tertiary
Zv Unteres Vilstal, Sitz Rieden9.9 km7,0004,633primary, secondary and tertiary
Freudenberg · Detp_bywen-K015710.6 km4,5002,945primary, secondary and tertiary
Kastl15.5 km4,5002,536primary, secondary and tertiary
Sulzbach-Rosenberg15.6 km45,00039,232primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Zab Amberg-Kümmersbruck, Sitz Amberg report?

Reported size: 170,000 h-e design capacity. Received load: 157,078 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Zab Amberg-Kümmersbruck, Sitz Amberg?

Aguas SB simulator reference scenario for 157,078 p.e. of reported load: 4,897,290 kWh per year (31.2 kWh per p.e. of average load), with aeration as 57 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.