Worldwide wastewater treatment observatory · Germany

Aguas SB Observatory · public data to understand water

WWTP ZV Mindel-Kammel Sitz Offingen

Germany · official identifier DETP_BYDON-K0215

30,000h-e design capacity (2022) · 964th of 3,798 (tied with 66 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DETP_BYDON-K0215 · reported size 30,000 h-e design capacity · received load 29,928 h-e · reported treatment: PST · data year 2022. 964th of 3,798 records with reported size in the inventory of Germany (tied with 66 others); 0.02 % of the sum of those 3,798 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.7 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

30,000h-e design capacity
29,928h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
964th of 3,798by reported size among the 3,798 records with a size in the inventory (tied with 66 others) · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates48.4899, 10.3837 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Germany

Regulatory framework of Germany · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,304,228reference kWh per year for this load
43.5kWh per h-e (average load) per year
195,634€ per year at 0.15 €/kWh
53 %share of energy used for aeration

what this estimate is · Inputs: 29,928 p.e. of reported load; equivalent average load 29,950 p.e. with the reference profile of Germany (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

2.4estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (6,464 m³/day of reference), not measured or available for reclamation.

LOCATION

Germany: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Burgau5.7 km18,75012,557primary, secondary and tertiary
Gundelfingen7.2 km25,00013,292primary, secondary and tertiary
Günzburg7.6 km110,00058,532primary, secondary and tertiary
Zv Untere Brenz Sitz Bächingen7.6 km9,9009,131primary, secondary and tertiary
Jettingen-Scheppach9.1 km18,00011,860primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ZV Mindel-Kammel Sitz Offingen report?

Reported size: 30,000 h-e design capacity. Received load: 29,928 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of ZV Mindel-Kammel Sitz Offingen?

Aguas SB simulator reference scenario for 29,928 p.e. of reported load: 1,304,228 kWh per year (43.5 kWh per p.e. of average load), with aeration as 53 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.