Worldwide wastewater treatment observatory · Greece

Aguas SB Observatory · public data to understand water

WWTP AGHII THEODORI

Greece · official identifier EL2530020115

25,850h-e design capacity (2022) · 73rd of 273

Facility inactive according to reported data. Historical profile: excluded from current aggregates.

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier EL2530020115 · reported size 25,850 h-e design capacity · reported treatment: PST · data year 2022. 73rd of 273 records with reported size in the inventory of Greece; 0.18 % of the sum of those 273 records in h-e (sum of records, not national capacity); nearest inventoried plant at 10.5 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

25,850h-e design capacity
73rd of 273by reported size among the 273 records with a size in the inventory · 0.18 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalnot reported
UV disinfectionnot reported
Statusinactive according to reported data
Reported coordinates37.9166, 23.0951 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Greece

Regulatory framework of Greece · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Greece: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Korinthos-Loytraki10.5 km90,00062,000primary, secondary and tertiary
Megara26.5 km43,33025,293primary, secondary and tertiary
Archea Epidavros30.7 km5,0004,606primary, secondary and tertiary
Kiato30.9 km23,01515,000primary, secondary and tertiary
Vilia34.4 km10,8332,110primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP AGHII THEODORI report?

Reported size: 25,850 h-e design capacity. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.