Worldwide wastewater treatment observatory · Greece

Aguas SB Observatory · public data to understand water

WWTP ALIARTOS

Greece · official identifier EL241003019

10,500h-e design capacity (2022) · 169th of 273

Facility inactive according to reported data. Historical profile: excluded from current aggregates.

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier EL241003019 · reported size 10,500 h-e design capacity · reported treatment: PST · data year 2022. 169th of 273 records with reported size in the inventory of Greece; 0.07 % of the sum of those 273 records in h-e (sum of records, not national capacity); nearest inventoried plant at 18.2 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

10,500h-e design capacity
169th of 273by reported size among the 273 records with a size in the inventory · 0.07 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusinactive according to reported data
Reported coordinates38.3807, 23.1291 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Greece

Regulatory framework of Greece · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Greece: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Thiva19.1 km40,00024,226primary, secondary and tertiary
Levadia20.4 km30,00025,000primary, secondary and tertiary
Erythres24.6 km6,6002,822primary, secondary and tertiary
Malessina31.1 km8,0003,742primary, secondary and tertiary
Vilia31.3 km10,8332,110primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ALIARTOS report?

Reported size: 10,500 h-e design capacity. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.