Worldwide wastewater treatment observatory · Greece
Aguas SB Observatory · public data to understand water
WWTP ATALANTI
Greece · official identifier EL2440050117
10,000h-e design capacity (2022) · 172nd of 273 (tied with 10 others)
Facility inactive according to reported data. Historical profile: excluded from current aggregates.
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier EL2440050117 · reported size 10,000 h-e design capacity · reported treatment: PST · data year 2022. 172nd of 273 records with reported size in the inventory of Greece (tied with 10 others); 0.07 % of the sum of those 273 records in h-e (sum of records, not national capacity); nearest inventoried plant at 16.0 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | inactive according to reported data |
| Reported coordinates | 38.6493, 23.0573 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Greece
Regulatory framework of Greece · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Malessina | 19.4 km | 8,000 | 3,742 | primary, secondary and tertiary |
| Aedipsos | 21.3 km | 23,000 | 6,445 | primary, secondary and tertiary |
| Levadia | 25.1 km | 30,000 | 25,000 | primary, secondary and tertiary |
| Limni | 26.3 km | 8,200 | 1,612 | primary and secondary |
| Tithorea | 28.0 km | 12,000 | 3,318 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP ATALANTI report?
Reported size: 10,000 h-e design capacity. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.