Worldwide wastewater treatment observatory · Greece

Aguas SB Observatory · public data to understand water

WWTP CHRYSSOUPOLI

Greece · official identifier EL115011018

16,000h-e design capacity (2022) · 110th of 273 (tied with 2 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier EL115011018 · reported size 16,000 h-e design capacity · received load 16,000 h-e · reported treatment: PST · data year 2022. 110th of 273 records with reported size in the inventory of Greece (tied with 2 others); 0.11 % of the sum of those 273 records in h-e (sum of records, not national capacity); nearest inventoried plant at 20.6 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

16,000h-e design capacity
16,000h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
110th of 273by reported size among the 273 records with a size in the inventory (tied with 2 others) · 0.11 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates40.9625, 24.7047 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Greece

Regulatory framework of Greece · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

673,270reference kWh per year for this load
42.1kWh per h-e (average load) per year
100,990€ per year at 0.15 €/kWh
51 %share of energy used for aeration

what this estimate is · Inputs: 16,000 p.e. of reported load; equivalent average load 16,001 p.e. with the reference profile of Greece (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (2,832 m³/day of reference), not measured or available for reclamation.

LOCATION

Greece: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Xanthi20.6 km90,00070,000primary, secondary and tertiary
Thassos20.9 km15,0006,939primary, secondary and tertiary
Kavala21.4 km96,00080,000primary, secondary and tertiary
Panaghia-Potamia Thassou27.3 km20,00016,000primary, secondary and tertiary
Palaion Tsiflikion29.7 km12,0004,500primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP CHRYSSOUPOLI report?

Reported size: 16,000 h-e design capacity. Received load: 16,000 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of CHRYSSOUPOLI?

Aguas SB simulator reference scenario for 16,000 p.e. of reported load: 673,270 kWh per year (42.1 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.