WWTP ELASSONA

Greece · official identifier EL142008018

12,233h-e design capacity (2022) · 142nd of 273

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier EL142008018 · reported size 12,233 h-e design capacity · received load 9,555 h-e · reported treatment: PST · data year 2022. 142nd of 273 records with reported size in the inventory of Greece; 0.08 % of the sum of those 273 records in h-e (sum of records, not national capacity); nearest inventoried plant at 19.2 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

12,233h-e design capacity
9,555h-e received load (2022)
78 %reported load/capacity ratio (not hydraulic utilisation)
142nd of 273by reported size among the 273 records with a size in the inventory · 0.08 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates39.8840, 22.1757 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Greece

Regulatory framework of Greece · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

406,834reference kWh per year for this load
42.6kWh per h-e (average load) per year
61,025€ per year at 0.15 €/kWh
51 %share of energy used for aeration

what this estimate is · Inputs: 9,555 p.e. of reported load; equivalent average load 9,554 p.e. with the reference profile of Greece (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.6estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,691 m³/day of reference), not measured or available for reclamation.

LOCATION

Greece: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Tyrnavos19.2 km19,50010,898primary, secondary and tertiary
Livadi26.3 km5,0002,274primary, secondary and tertiary
Deskati28.9 km7,0203,548primary, secondary and tertiary
Yannouli32.0 km10,83311,630primary, secondary and tertiary
Larissa33.3 km227,500145,592primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ELASSONA report?

Reported size: 12,233 h-e design capacity. Received load: 9,555 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of ELASSONA?

Aguas SB simulator reference scenario for 9,555 p.e. of reported load: 406,834 kWh per year (42.6 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.