Worldwide wastewater treatment observatory · Greece

Aguas SB Observatory · public data to understand water

WWTP GASTOUNI

Greece · official identifier EL23301001070111

12,833h-e design capacity (2022) · 136th of 273

Facility inactive according to reported data. Historical profile: excluded from current aggregates.

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier EL23301001070111 · reported size 12,833 h-e design capacity · reported treatment: PST · data year 2022. 136th of 273 records with reported size in the inventory of Greece; 0.09 % of the sum of those 273 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.1 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

12,833h-e design capacity
136th of 273by reported size among the 273 records with a size in the inventory · 0.09 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusinactive according to reported data
Reported coordinates37.8224, 21.2405 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Greece

Regulatory framework of Greece · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Greece: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Amaliada8.1 km23,83316,830primary, secondary and tertiary
Lechena14.2 km13,93310,306primary, secondary and tertiary
Pyrgos27.5 km35,00025,000primary, secondary and tertiary
Zakynthos32.1 km43,33344,550primary, secondary and tertiary
Archea Olympia39.1 km11,8332,472primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP GASTOUNI report?

Reported size: 12,833 h-e design capacity. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.