Worldwide wastewater treatment observatory · Greece
Aguas SB Observatory · public data to understand water
WWTP NEOS MARMARAS
Greece · official identifier EL1270110445
20,000h-e design capacity (2022) · 85th of 273 (tied with 12 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier EL1270110445 · reported size 20,000 h-e design capacity · received load 7,952 h-e · reported treatment: PST · data year 2022. 85th of 273 records with reported size in the inventory of Greece (tied with 12 others); 0.14 % of the sum of those 273 records in h-e (sum of records, not national capacity); nearest inventoried plant at 14.3 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 40.0993, 23.7928 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Greece
Regulatory framework of Greece · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 7,952 p.e. of reported load; equivalent average load 7,955 p.e. with the reference profile of Greece (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,408 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Sarti | 14.3 km | 15,000 | 2,608 | primary, secondary and tertiary |
| Sykea | 15.9 km | 2,000 | 2,000 | primary, secondary and tertiary |
| Aghios Nikolaos Sithonias | 17.8 km | 3,000 | 2,365 | primary, secondary and tertiary |
| Nikiti | 18.6 km | 17,000 | 9,133 | primary, secondary and tertiary |
| Pefkochori | 20.4 km | 43,333 | 13,904 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP NEOS MARMARAS report?
Reported size: 20,000 h-e design capacity. Received load: 7,952 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of NEOS MARMARAS?
Aguas SB simulator reference scenario for 7,952 p.e. of reported load: 342,048 kWh per year (43.0 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.