Worldwide wastewater treatment observatory · Greece

Aguas SB Observatory · public data to understand water

WWTP TRIPOLI

Greece · official identifier EL252001013

68,133h-e design capacity (2022) · 28th of 273

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier EL252001013 · reported size 68,133 h-e design capacity · received load 43,766 h-e · reported treatment: PST · data year 2022. 28th of 273 records with reported size in the inventory of Greece; 0.47 % of the sum of those 273 records in h-e (sum of records, not national capacity); nearest inventoried plant at 29.1 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

68,133h-e design capacity
43,766h-e received load (2022)
64 %reported load/capacity ratio (not hydraulic utilisation)
28th of 273by reported size among the 273 records with a size in the inventory · 0.47 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates37.5097, 22.4184 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Greece

Regulatory framework of Greece · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,703,894reference kWh per year for this load
38.9kWh per h-e (average load) per year
255,584€ per year at 0.15 €/kWh
58 %share of energy used for aeration

what this estimate is · Inputs: 43,766 p.e. of reported load; equivalent average load 43,771 p.e. with the reference profile of Greece (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

2.8estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (7,747 m³/day of reference), not measured or available for reclamation.

LOCATION

Greece: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Voria Kynouria29.9 km10,0007,899primary, secondary and tertiary
Argos-Nafplio33.3 km133,00098,600primary, secondary and tertiary
Tolo38.5 km18,12910,000primary, secondary and tertiary
Sparti48.9 km40,00021,780primary, secondary and tertiary
Lygourio55.4 km5,0002,596primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP TRIPOLI report?

Reported size: 68,133 h-e design capacity. Received load: 43,766 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of TRIPOLI?

Aguas SB simulator reference scenario for 43,766 p.e. of reported load: 1,703,894 kWh per year (38.9 kWh per p.e. of average load), with aeration as 58 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.