Worldwide wastewater treatment observatory · Hungary

Aguas SB Observatory · public data to understand water

WWTP Abaujszanto - Szennyviztisztito Telep

Hungary · official identifier HU-WWTP-AHY977

10,542h-e design capacity (2022) · 201st of 829

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AHY977 · reported size 10,542 h-e design capacity · received load 5,320 h-e · reported treatment: PST · data year 2022. 201st of 829 records with reported size in the inventory of Hungary; 0.07 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.9 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

10,542h-e design capacity
5,320h-e received load (2022)
50 %reported load/capacity ratio (not hydraulic utilisation)
201st of 829by reported size among the 829 records with a size in the inventory · 0.07 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates48.2600, 21.1784 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Regulatory reference: Hungary

Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

202,403reference kWh per year for this load
42.9kWh per h-e (average load) per year
30,361€ per year at 0.15 €/kWh
77 %share of energy used for aeration

what this estimate is · Inputs: 5,320 p.e. of reported load; equivalent average load 4,715 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (521 m³/day of reference), not measured or available for reclamation.

LOCATION

Hungary: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Hernadszentandras - Szennyviztisztito Telep7.9 km5,4004,765primary, secondary and tertiary
Encs - Szennyviztisztito Telep7.9 km8,8038,278primary, secondary and tertiary
Szerencs - Szennyviztisztito Telep12.5 km14,50014,689primary, secondary and tertiary
Halmaj - Szennyviztisztito Telep12.8 km7,0005,375primary, secondary and tertiary
Megyaszo - Szennyviztisztito Telep14.1 km4,2002,990primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Abaujszanto - Szennyviztisztito Telep report?

Reported size: 10,542 h-e design capacity. Received load: 5,320 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Abaujszanto - Szennyviztisztito Telep?

Aguas SB simulator reference scenario for 5,320 p.e. of reported load: 202,403 kWh per year (42.9 kWh per p.e. of average load), with aeration as 77 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.