Worldwide wastewater treatment observatory · Hungary

Aguas SB Observatory · public data to understand water

WWTP Alsomocsolad - Szennyviztisztito Telep

Hungary · official identifier HU-WWTP-AIQ740

250h-e design capacity (2022) · 776th of 829 (tied with 3 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AIQ740 · reported size 250 h-e design capacity · received load 193 h-e · reported treatment: PS · data year 2022. 776th of 829 records with reported size in the inventory of Hungary (tied with 3 others); < 0.01 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.5 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

250h-e design capacity
193h-e received load (2022)
77 %reported load/capacity ratio (not hydraulic utilisation)
776th of 829by reported size among the 829 records with a size in the inventory (tied with 3 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates46.3129, 18.2429 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Regulatory reference: Hungary

Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

13,297reference kWh per year for this load
77.3kWh per h-e (average load) per year
1,995€ per year at 0.15 €/kWh
55 %share of energy used for aeration

what this estimate is · Inputs: 193 p.e. of reported load; equivalent average load 172 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (19 m³/day of reference), not measured or available for reclamation.

LOCATION

Hungary: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Magocs - Szennyviztisztito Telep2.5 km2,1001,878primary and secondary
Egyhazaskozar - Szennyviztisztito Telep6.7 km837631primary and secondary
Kaposszekcso - Szennyviztisztito Telep7.3 km4,0172,498primary and secondary
Csikostottos - Szennyviztisztito Telep7.9 km890725primary, secondary and tertiary
Dombovar - Szennyviztisztito Telep9.5 km27,86519,443primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Alsomocsolad - Szennyviztisztito Telep report?

Reported size: 250 h-e design capacity. Received load: 193 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Alsomocsolad - Szennyviztisztito Telep?

Aguas SB simulator reference scenario for 193 p.e. of reported load: 13,297 kWh per year (77.3 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.