WWTP Gyomro - Szennyviztisztito Telep

Hungary · official identifier HU-WWTP-AIB749

32,000h-e design capacity (2022) · 76th of 829 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AIB749 · reported size 32,000 h-e design capacity · received load 68,665 h-e · reported treatment: PST · data year 2022. 76th of 829 records with reported size in the inventory of Hungary (tied with 1 others); 0.21 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.2 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

32,000h-e design capacity
68,665h-e received load (2022)
215 %reported load/capacity ratio (not hydraulic utilisation)
76th of 829by reported size among the 829 records with a size in the inventory (tied with 1 others) · 0.21 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates47.4046, 19.3772 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Hungary

Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,973,522reference kWh per year for this load
32.4kWh per h-e (average load) per year
296,028€ per year at 0.15 €/kWh
63 %share of energy used for aeration

what this estimate is · Inputs: 68,665 p.e. of reported load; equivalent average load 60,897 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

2.5estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (6,729 m³/day of reference), not measured or available for reclamation.

LOCATION

Hungary: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Monor - Szennyviztisztito Telep6.2 km26,86330,501primary, secondary and tertiary
Pecel - Szennyviztisztito Telep10.9 km17,46817,077primary, secondary and tertiary
Isaszeg - Szennyviztisztito Telep13.6 km13,33310,983primary, secondary and tertiary
Ocsa - Szennyviztisztito Telep14.1 km14,00016,651primary, secondary and tertiary
Sulysap - Szennyviztisztito Telep14.9 km27,86622,707primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Gyomro - Szennyviztisztito Telep report?

Reported size: 32,000 h-e design capacity. Received load: 68,665 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Gyomro - Szennyviztisztito Telep?

Aguas SB simulator reference scenario for 68,665 p.e. of reported load: 1,973,522 kWh per year (32.4 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.