WWTP Hegyhathodasz Szennyviztisztito Telep

Hungary · official identifier HU-WWTP-ANS683

180h-e design capacity (2022) · 800th of 829

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-ANS683 · reported size 180 h-e design capacity · received load 114 h-e · reported treatment: PST · data year 2022. 800th of 829 records with reported size in the inventory of Hungary; < 0.01 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.9 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

180h-e design capacity
114h-e received load (2022)
63 %reported load/capacity ratio (not hydraulic utilisation)
800th of 829by reported size among the 829 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates46.9333, 16.6610 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Regulatory reference: Hungary

Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

9,678reference kWh per year for this load
97.2kWh per h-e (average load) per year
1,452€ per year at 0.15 €/kWh
44 %share of energy used for aeration

what this estimate is · Inputs: 114 p.e. of reported load; equivalent average load 100 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (11 m³/day of reference), not measured or available for reclamation.

LOCATION

Hungary: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Nadasd - Szennyviztisztito Telep5.9 km2,2041,758primary, secondary and tertiary
Gersekarat - Szennyviztisztito Telep8.5 km1,000638primary and secondary
Kormend - Szennyviztisztito Telep9.1 km20,00014,420primary, secondary and tertiary
Zalalovo - (Irsapuszta, Szucsmajor Nelkul) - Szennyviztiszti10.7 km4,7723,463primary, secondary and tertiary
Ivanc - Szennyviztisztito Telep11.6 km2,8752,079primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Hegyhathodasz Szennyviztisztito Telep report?

Reported size: 180 h-e design capacity. Received load: 114 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Hegyhathodasz Szennyviztisztito Telep?

Aguas SB simulator reference scenario for 114 p.e. of reported load: 9,678 kWh per year (97.2 kWh per p.e. of average load), with aeration as 44 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.