Worldwide wastewater treatment observatory · Hungary

Aguas SB Observatory · public data to understand water

WWTP Keszthely - Szennyviztisztito Telep

Hungary · official identifier HU-WWTP-AIA814

120,890h-e design capacity (2022) · 22nd of 829

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AIA814 · reported size 120,890 h-e design capacity · received load 58,174 h-e · reported treatment: PST · data year 2022. 22nd of 829 records with reported size in the inventory of Hungary; 0.80 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.5 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

120,890h-e design capacity
58,174h-e received load (2022)
48 %reported load/capacity ratio (not hydraulic utilisation)
22nd of 829by reported size among the 829 records with a size in the inventory · 0.80 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates46.7368, 17.2366 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Hungary

Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,727,733reference kWh per year for this load
33.5kWh per h-e (average load) per year
259,160€ per year at 0.15 €/kWh
63 %share of energy used for aeration

what this estimate is · Inputs: 58,174 p.e. of reported load; equivalent average load 51,594 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

2.1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (5,701 m³/day of reference), not measured or available for reclamation.

LOCATION

Hungary: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Zalaapati - Szennyviztisztito Telep9.5 km1,9681,957primary, secondary and tertiary
Esztergalyhorvati - Szennyviztisztito Telep10.3 km625288primary, secondary and tertiary
Zalacsany - Szennyviztisztito Telep13.0 km1,0001,227primary, secondary and tertiary
Vallus - Szennyviztisztito Telep13.1 km100197primary, secondary and tertiary
Zalaszentmarton - Szennyviztisztito Telep13.3 km7650primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Keszthely - Szennyviztisztito Telep report?

Reported size: 120,890 h-e design capacity. Received load: 58,174 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Keszthely - Szennyviztisztito Telep?

Aguas SB simulator reference scenario for 58,174 p.e. of reported load: 1,727,733 kWh per year (33.5 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.