Worldwide wastewater treatment observatory · Hungary

Aguas SB Observatory · public data to understand water

WWTP Lakitelek - Szennyviztisztito Telep

Hungary · official identifier HU-WWTP-AIA904

9,376h-e design capacity (2022) · 223rd of 829

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AIA904 · reported size 9,376 h-e design capacity · received load 3,404 h-e · reported treatment: PS · data year 2022. 223rd of 829 records with reported size in the inventory of Hungary; 0.06 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.6 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

9,376h-e design capacity
3,404h-e received load (2022)
36 %reported load/capacity ratio (not hydraulic utilisation)
223rd of 829by reported size among the 829 records with a size in the inventory · 0.06 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates46.8833, 20.0266 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Regulatory reference: Hungary

Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

132,396reference kWh per year for this load
43.8kWh per h-e (average load) per year
19,859€ per year at 0.15 €/kWh
75 %share of energy used for aeration

what this estimate is · Inputs: 3,404 p.e. of reported load; equivalent average load 3,023 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.1estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (334 m³/day of reference), not measured or available for reclamation.

LOCATION

Hungary: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Tiszakecske - Szennyviztisztito Telep6.6 km32,0009,979primary, secondary and tertiary
Tiszaalpar - Szennyviztisztito Telep9.1 km5,5003,599primary, secondary and tertiary
Tiszasas - Szennyviztisztito Telep9.2 km4,6782,563primary, secondary and tertiary
Szentkiraly Szennyviztisztito Telep9.6 km1,984955primary and secondary
Nyarlorinc - Szennyviztisztito Telep12.2 km2,2001,824primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Lakitelek - Szennyviztisztito Telep report?

Reported size: 9,376 h-e design capacity. Received load: 3,404 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Lakitelek - Szennyviztisztito Telep?

Aguas SB simulator reference scenario for 3,404 p.e. of reported load: 132,396 kWh per year (43.8 kWh per p.e. of average load), with aeration as 75 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.