Worldwide wastewater treatment observatory · Hungary

Aguas SB Observatory · public data to understand water

WWTP Martfu - Szennyviztisztito Telep

Hungary · official identifier HU-WWTP-AIA959

6,600h-e design capacity (2022) · 292nd of 829 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AIA959 · reported size 6,600 h-e design capacity · received load 5,981 h-e · reported treatment: PS · data year 2022. 292nd of 829 records with reported size in the inventory of Hungary (tied with 1 others); 0.04 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.7 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

6,600h-e design capacity
5,981h-e received load (2022)
91 %reported load/capacity ratio (not hydraulic utilisation)
292nd of 829by reported size among the 829 records with a size in the inventory (tied with 1 others) · 0.04 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates47.0200, 20.2713 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Regulatory reference: Hungary

Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

201,821reference kWh per year for this load
38.1kWh per h-e (average load) per year
30,273€ per year at 0.15 €/kWh
55 %share of energy used for aeration

what this estimate is · Inputs: 5,981 p.e. of reported load; equivalent average load 5,303 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (586 m³/day of reference), not measured or available for reclamation.

LOCATION

Hungary: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Tiszafoldvar - Szennyviztisztito Telep3.7 km10,8338,059primary, secondary and tertiary
Cibakhaza - Szennyviztisztito Telep8.9 km3,4002,389primary and secondary
Mezohek - Szennyviztisztito Telep9.2 km150250primary and secondary
Jaszkarajeno - Szennyviztisztito Telep13.3 km2,7071,557primary, secondary and tertiary
Ocsod - Szennyviztisztito Telep15.8 km3,5462,245primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Martfu - Szennyviztisztito Telep report?

Reported size: 6,600 h-e design capacity. Received load: 5,981 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Martfu - Szennyviztisztito Telep?

Aguas SB simulator reference scenario for 5,981 p.e. of reported load: 201,821 kWh per year (38.1 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.