Worldwide wastewater treatment observatory · Hungary
Aguas SB Observatory · public data to understand water
WWTP Pali - Szennyviztisztito Telep
Hungary · official identifier HU-WWTP-AIB967
5,830h-e design capacity (2022) · 325th of 829
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AIB967 · reported size 5,830 h-e design capacity · received load 6,156 h-e · reported treatment: PS · data year 2022. 325th of 829 records with reported size in the inventory of Hungary; 0.04 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.4 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 47.4568, 17.1604 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Hungary
Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 6,156 p.e. of reported load; equivalent average load 5,457 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (603 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Kemenesszentpeter - Szennyviztisztito Telep | 6.4 km | 600 | 595 | primary and secondary |
| Kenyeri - Szennyviztisztito Telep | 9.7 km | 2,950 | 1,895 | primary, secondary and tertiary |
| Repcelak - Szennyviztisztito Telep | 11.0 km | 3,302 | 2,354 | primary and secondary |
| Szany - Szennyviztisztito Telep | 12.1 km | 8,000 | 6,081 | primary and secondary |
| Nick - Szennyviztisztito Telep | 12.3 km | 550 | 408 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Pali - Szennyviztisztito Telep report?
Reported size: 5,830 h-e design capacity. Received load: 6,156 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Pali - Szennyviztisztito Telep?
Aguas SB simulator reference scenario for 6,156 p.e. of reported load: 207,404 kWh per year (38.0 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.